Project information
GINOP-3.2.2-8-2-4-16-2020-02294
- the name of the beneficiary: SZERIP Szerelőipari Kivitelező és Tervező Zártkörűen Működő Részvénytársaság
- the title of the project: Introduction of a corporate management system at Szerip Zrt.
- Accountable total cost: HUF 36 750 790
- Amount of refundable subsidy: HUF 14 700 316
- amount of support: 40%
- project completion date: 08. 31. 2022.
Project content
SZERIP Zrt. is a 100% Hungarian-owned company that was founded in 1990 and deals with building engineering construction and maintenance, as well as planning. The goal of our project is the introduction of the Correct corporate management system. In connection with this, it is necessary to implement server and client-side hardware developments, as well as expert consulting related to the project. With the introduction of the system, our goal is to integrate the work of the administrative system workers, engineers, design engineers, preparers, warehousemen, material procurers, service and those directly managing the construction with a management system tailored to our company. From the introduction of the software, more efficient work, accurate material management and the possibility of constant insight into the status of current cases. The electronic worksheet will be introduced in the service area, which results in faster and more efficient work. For the processing of the worksheets, the data are immediately available to the administrative colleagues.